Elevator Upgrades

Starting next Monday, April 22, 2019, the metal on the elevator doors and entrance frames in the lobby will be record using an 18-gauge bronze with a satin finish.

Separately, each elevator will be taken out of service for three days. Please allow extra time during the morning rush. Note that deliveries and moves may be delayed on these days.

The schedule is as follows:

Car #1

Monday 422 (9:00am)
• Century Elevator removes hoistway door
• Velis recalls the entrance frame
• Velis picks up the hoistway door

Wednesday 4/22
• Velis returns the newly clad hoist way door
• Century Elevator reinstalls the door

Car#2

Monday 4/29 (9:00am)
• Century Elevator removes hoistway door
• Velis recalls the entrance frames
• Velis picks up the hoistway door

Wednesday 5/1
• Velis returns the newly clad hoistway door
• Century Elevator reinstallls the door

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>