Monthly Archives: May 2018

Public Notice

Please be advised that East 16th Street between 3rd Avenue and Rutherford Place will be close to through traffic starting Monday, May 21st, through June 15th, 2018, in order to erect steel with a mobile crane. The roadway will remain closed overnight for this time period. Thank you for your cooperation in this matter and we are sorry for any inconvenience these closures may cause you. Metropolitan Walters LLC

Third Avenue Façade Repairs

In order to perform mandatory façade repairs to the building along Third Avenue a pedestrian bridge will be installed on the sidewalk in front of the building on or about Monday May 7, 2018. The bridge will be fully alarmed and illuminated. At 12 feet in height it will be tall enough to clear the retail storefronts and their awnings. Repairs to the building façade will commence shortly after the bridge is in place so that it can be removed as soon as possible. We apologize for the disruption this may cause and thank you for your understanding.